You don't have javascript enabled. Good luck with that.
Pencarian
Dua Ruas Jalan di Jakarta Masih Tergenang
....
photo Aldi Geri Lumban Tobing - Beritajakarta.id

Jakarta BPBD: Two Roads in Jakarta Still Flooded

The Jakarta Regional Disaster Mitigation Agency (BPBD) has noted that two roads are still inundated as of 11.30 PM, Friday (2/3).

The inundation is targeted to recede quickly

The inundation arose due to moderate to heavy intensity rain that flushed most of Jakarta and high tides from Thursday (2/2) to today.

Jakarta BPBD Executing Unit Head, Isnawa Adji said personnel had been alerted to monitor inundation conditions in each region. His party is also coordinating with elements from the Jakarta Water Resources (SDA) Agency, Bina Marga Agency, and Fire and Rescue Agency (Gulkarmat) to suck up inundation and ensure the storm drains to function properly.

Jakarta BPBD Distributes Aid to Fire Survivors in Cipete Utara

“The handling efforts are also supported by the local urban village and sub-district heads. The inundation is targeted to recede quickly," he expressed, Friday (2/3).

Therefore, residents are urged to remain cautious and alert to potential inundation. "In an emergency, call 112 immediately. This 24-hour service is free of charge," he uttered.

Here are two inundated roads in Jakarta:

1. Jalan Kamal Benda Raya, RW 01, Kalideres Sub-district, West Jakarta with a water level of 20 centimeters

2. Jalan Bangun Nusa Raya RT 11 and 12/RW 03, Cengkareng Sub-district, West Jakarta with a water level of 5 centimeters

Linked News
Popular News indeks
  1. Joint Personnel Control Green Lane in Petamburan

    access_time25-04-2024 remove_red_eye890 personBudhi Firmansyah Surapati
  2. Waste Sorting Education Given for 500 Students of SDN 07

    access_time26-04-2024 remove_red_eye706 personAnita Karyati
  3. Central Government Teams Up with Japan to Realize Jakarta with TOD Concept

    access_time25-04-2024 remove_red_eye596 personFolmer
  4. 37.25 Ton of Campaign Prop Waste in West Jakarta Recycled

    access_time26-04-2024 remove_red_eye468 personTP Moan Simanjuntak
  5. LRT Phase 1B Construction Remains Positive

    access_time27-04-2024 remove_red_eye391 personAldi Geri Lumban Tobing